Partial Undergrounding for Extra-High Voltage AC Connections - Understanding the option of 380 kV AC underground cables complementing overhead lines

This document, produced under the RGI umbrella, looks to provide clarity by giving an overview of the current and common drivers, the risks, as well as potential mitigation solutions available in the deployment of extra-high voltage underground connections.

This document aims to give an overview of the state of play of extra-high voltage underground connections. It is based on the limited project experience, reports and research available, and on discussions with multidisciplinary experts. Although it is recognised that all projects are specific and require a case-by-case analysis, this is an attempt for the TSO and NGO communities to find common ground.

The project experience with partial undergrounding of 380 kV AC is limited but growing. UC sections have the potential to become an important option in the project development toolbox available to a TSO when planning and executing transmission projects. The collaborative work analysed and formulated recommendations with regard to:

  • Impact on the safety and security of the electrical operation
  • Legal and regulatory frameworks
  • Environmental impacts
  • Public Acceptance
  • Financial aspects

For more information regarding partial undergrounding, please get in touch with us and contact Cristina Simioli (cristina@renewables-grid.eu).

Image source: TenneT

Contact

Cristina Simioli
Director - Offshore Energy and Nature

Load more
t: +49 30 2332 11023
cristina[at]renewables-grid.eu

RGI gratefully acknowledges the EU LIFE funding support:

EU LIFE funding support Logo

Funded by the European Union. Views and opinions expressed are however those of the author(s) only and do not necessarily reflect those of the European Union or the LIFE Programme. Neither the European Union nor the granting authority can be held responsible for them.